Project Library

Project Maps

Studies

Cultural Survey Reports

Cultural Survey Reports are Available by request.

The following cultural survey reports needed for specific purposes may be available by request by e-mailing Terry Williams, Corps of Engineers Project Manager, at terryl.l.williams@usace.army.mil

  • Dolin, Melissa M. 2014. Final Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of 2014 Phase I Cultural Resources Investigations for the Wild Rice Dam Fish Passage Mitigation Project. Prepared for the Diversion Authority and the USACE. August 29, 2014.
  • Ferris, Kade M. 2011. A Traditional Cultural Property Survey of the Fargo-Moorhead Metro Area Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota. Prepared for the City of Fargo and the USACE, St. Paul. August 29, 2011.
  • Jones, Rhiannon, Katherine Shillinglaw. 2013. Archaeological Testing To Verify A Reported Grave Site (32CSC362) at the Sheyenne River Crossing of the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota. Prepared for the USACE, St. Paul. October 2013.
  • Jones, R., et. al. 2013. Report of Investigation 811: Phase II Evaluation of Archeological Sites 32SC0201 & 32SCX384 Reaches 1 and 4, of the Fargo-Moorhead Metro Flood Risk Management Diversion Channel Alignment, Cass County, North Dakota. Prepared for the USACE, St. Paul. March 2013.
  • Jones, R., et. al. 2014. Phase II Evaluation of Thirteen Archeological Sites Fargo-Moorhead Metro Flood Risk Management Diversion Channel Alignment, Cass County, North Dakota. Prepared for the USACE, St. Paul. March 2014.
  • McCarthy, Melinda M. 2015a. The Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of Phase I Cultural Resources Investigations at 32CS4278, 32CS4292, 32CS4294, 32CS4296, 32CS4298, and 32CS4300 for the Mickelson Field Levee Extension Phase I. Prepared for the Diversion Authority and USACE, St. Paul. June 2015.
  • McCarthy, Melinda M. 2015b. The Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of Phase I Cultural Resources Investigations for the Mickelson Field Levee Extension—Indirect APE. Prepared for the Diversion Authority and USACE, St. Paul. July 2015.
  • McCarthy, Melinda M., et. al. 2014. Final Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota: Results of 2013-2014 Phase I Cultural Resources Investigations for the In-Town Levee and Floodwall, El Zagal Phase 2, and Reaches 1-6 of the North Dakota Diversion. Prepared for the Diversion Authority and USACE, St. Paul. November 17, 2014.
  • Meier, Marcia, et. al. 2013. Final Report: The Fargo-Moorhead Flood Risk Management Project, Cass County, North Dakota and Clay County, Minnesota: Results Phase I Cultural Resources Investigations, 2012. Prepared for the Diversion Authority and USACE, St. Paul. July 2013.
  • Meier, Marcia, et. al. 2014. Draft Report for the Fargo-Moorhead Metro Flood Risk Management Project, Cass County, North Dakota: Results of 2013 Phase I Cultural Resources Investigations for the Oxbow-Hickson-Bakke Ring Levee. Prepared for the Diversion Authority and USACE, St. Paul. March 2014.

 

If a document is not posted on this website but should be made available, please message us via the Contact Us page to make a request.

Podcast Episodes

Educational One-Page Printable Documents

Presentations

USACE March 2021 Update

USACE March 2021 Update

1. Diversion Inlet Structure Construction  Structure includes 3-50 ft. wide Tainter gates.

USACE February 2021 Update

USACE February 2021 Update

1. Diversion Inlet Structure Construction  Structure includes 3-50 ft. wide Tainter gates.

USACE January 2021 Update

USACE January 2021 Update

1. Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates.

USACE December 2020 Update

USACE December 2020 Update

1 Diversion Inlet Structure Construction  Structure includes 3-50 ft. wide Tainter gates.

USACE November 2020 Update

USACE November 2020 Update

November 19, 2020 1 Diversion Inlet Structure Construction Structure includes 3-50 ft.

Presentation: FM Greenway Recreation Plan

Presentation: FM Greenway Recreation Plan

FM Greenway Recreation Master Plan PresentationPresented to the Diversion Authority Land Management

MetroCOG Rec Plan Presentation – October 21, 2020

MetroCOG Rec Plan Presentation – October 21, 2020

MetroCOG Rec Plan Presentation - October 21, 2020 https://youtu.be/3hfX9G2cpRQ

USACE October 2020 Update

USACE October 2020 Update

October 22, 2020 1 Diversion Inlet Structure Construction Structure includes 3-50 ft.

Flowage Easement Study Presentation – September 30, 2020

Flowage Easement Study Presentation – September 30, 2020

Land Management Committee Meeting - September 30, 2020 https://youtu.be/Zy06DDcj2JU

Virtual Project Tour

Virtual Project Tour

Take a virtual tour of the FM Area Diversion Project with Executive

Load More

Governors' Task Force

Meeting Summaries
Meeting Videos

Dec. 11 Meeting

Nov. 29 Meeting

Nov. 13 Meeting

Nov. 1 Meeting

Oct. 23 meeting

Meeting Agendas and Presentations

December 11, 2018 Meeting

Agenda

Presentations

Handouts


November 29, 2018 Meeting

Agenda

Presentations

Handouts

 

November 13, 2018 Meeting

Agenda

Presentations

Handouts


November 1, 2018 Meeting

Agenda

Presentations

Handouts


October 23, 2018 Meeting

Agenda

Presentations

Handouts