Media Kit Links to Available Media Kit Resources Downloadable Photos MFDA Logos and Resources Board and Committee Members Contact Information Back to News Releases Photos Tip for Downloading image A team inspects and checks the dimensions of a Tainter gate being manufactured for the FM Area Diversion. (Photo from Metro Flood Diversion Authority)Joe Pihlaja with Ames Construction notes measurements during a Tainter gate inspection at Steward Machine Company in Bainbridge, Georgia. (Photo from Metro Flood Diversion Authority)A team inspects and checks the dimensions of a Tainter gate being manufactured for the FM Area Diversion. (Photo from Metro Flood Diversion Authority)Steward Machine Company Plant 3 is shown in Bainbridge, Georgia, where the company is manufacturing Tainter gates for the FM Area Diversion. (Photo from Metro Flood Diversion Authority)A man reviews specs and measurements during a Tainter gate inspection at Steward Machine Company in Bainbridge, Georgia. (Photo from Metro Flood Diversion Authority)Joe Pihlaja (left), with Ames Construction, inspects a trunnion hub on one of the large gates that will control floodwater flow through the FM Area Diversion. (Photo from Metro Flood Diversion Authority)Jose Gonzalez (right), with Steward Machine Company in Bainbridge, Georgia, speaks with Duane Perkins (center), the lead structural engineer for the U.S. Army Corps of Engineers on the Diversion Inlet Structure, during a visit to perform dimensional checks on gates that will be used in FM Area Diversion structures. (Photo from Metro Flood Diversion Authority) Previous Next MFDA Logos and Resources 300dpi White .PNG logo w/transparent background 300dpi Full-color .PNG logo w/transparent background