Supplemental Draft Feasibility Report and Environmental Impact Statement: Consultant’s Report (April 2011)
Volume 1: Feasibility Study – Phase 4: General Report
Volume 2: Feasibility Study – Phase 4: Appendix A Cover Letter
Volume 2: Appendix A – Hydrology: Executive Summary
Volume 2: Appendix A – 1b: Hydrology
Volume 2: Appendix A – 1c: Hydrology
Volume 2: Appendix A-2: Hydrology
Volume 2: Appendix A-3: Hydrology
Volume 2: Appendix A-4a: Hydrology
Volume 2: Appendix A-4b: Hydrology
Volume 3: Feasibility Study – Phase 4: Appendices B-E Cover Letter
Volume 3: Appendix B – Hydraulics Existing Condition
Volume 3: Appendix C – Hydraulics With Project Conditions
Volume 3: Appendix D – Civil and Geotechnical Design
Volume 3: Appendix E – Bridge Structures
Volume 4: Feasibility Study – Phase 4: Appendix F Cover Letter
Volume 4: Appendix F – Hydraulic Structures
Volume 4: Appendix F – Hydraulic Structures: Exhibit A – Background Hydrologic Information
Volume 4: Exhibit Q – Control Structure Computations
Volume 4: Exhibit R – Aqueduct Computations
Volume 5: Appendix G