I-29 Crack Repairs – Phase 31B (WP-31B)
Sealed Bids for the construction of the I-29 Crack Repairs – Phase 31B (WP-31B) project will be received at the office of Ohnstad Twichell, 444 Sheyenne Street, Suite 102, West Fargo, ND 58078, until 1:00 p.m. local time on January 8, 2026. The project will remove and replace existing concrete roadway panels, expansion joints and concrete sleeper slabs immediately north and south of the I-29 Borrow Ditch crossing structures on the northbound and southbound roadways located near mile point 53.31. Read more here.
No bid tabulations available at this time.