- Supplemental Environmental Assessment
- Appendix A – Final Report
- Appendix B – Technical Advisory Group Summary
- Appendix C – Alternative C Analysis
- Appendix D – Hydrology and Hydraulics
- Appendix E – Northwest Alignment Summary
- Appendix F – Wild Rice Structure Micrositing
- Appendix G – Adaptive Management Plan
- Appendix H – Transportation Plan
- Appendix I – River Stage 37′ Impacts
- Appendix J – Public Comments
- Appendix K – Public Comments on SEA #2
Draft Supplemental EA
- Public Notice
- Draft Supplemental Environmental Assessment
- Appendix A – Task Force Report
- Appendix B – Technical Advisory Group Summary
- Appendix C – Alternative C Analysis
- Appendix D – Hydrology and Hydraulics
- Appendix E – Northwest Alignment Summary
- Appendix F – Wild Rice Structure Micrositing
- Appendix G – Adaptive Management Plan
- Appendix H – Transportation Plan
- Appendix I – River Stage 37′ Impacts
- Attachments – Draft 404 permit; Draft FONSI; Glossary; Acronyms
Pre-2015 USACE documents
- Supplemental Environmental Assessment (EA)
- Doc date: September 1, 2013
- There is a host of docs below this SEA to be attached
- Final Feasibility Report, Environmental Impact Statement, Appendices, and Comments
- Doc date: July 1, 2011
- The is a host of docs below the FFR and EIS to be attached
- Industry Day Presentations and Information
- Record of Decision
- Doc Date: April 3, 2012
- Office of Management and Budget Clearance Letter
- Doc date: March 28, 2012
- Signed Report of the Chief of Engineers
- Doc date: Dec 19, 2011
- Joint Memorandum: Federal Emergency Management Agency / U.S. Army Corps of Engineers Joint Actions on Planning for Flood Risk Management Projects. June 20, 2012
- Safety of Dams: Policy and Procedures (ER110-2-1156). Department of the Army, U.S. Army Corps of Engineers, Washington, D.C., October 28, 2011
- Environmental Assessment Drayton Dam Fish Passage Mitigation Project, Pembina County, North Dakota, and Kittson County, Minnesota
- Doc date: January 23, 2013
- FMM Geomorphology Meeting with Minnesota DNR Agenda and Notes. January 25, 2013.
- Guidelines for Planting Plan of the Fargo Moorhead Diversion Channel
- Doc date: May 6, 2013
- Status Summary of Follow up Items tasked to USACE from December 10, 2012 Geomorphology Technical Meeting for the Fargo Moorhead Metro Flood Risk Management Project EIS Meeting. January 25, 2013
- Development of Conceptual Designs for the Prevention of Ice Formation in the Proposed Maple River Aqueduct, July 2014
- Doc date: September 1, 2014
- Phase I Environmental Assessment Report: Oxbow Hickson Bakke
- Doc date: August 15, 2014
- Report: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Doc date: Nov 1, 2010
- Attach below the main doc above Appendices A - I
- Appendix A Part 1: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix A Part 2: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix A Part 3: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix A Part 4: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix B: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix C: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix D: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix E: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix F: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix G: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix H: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Appendix I: Phase I Environmental Site Assessment, Moorhead Metro Feasibility Study HTRW, Clay County, Minnesota. Prepared for the USACE. November 2010
- Report: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Doc date: November 1, 2010
- Attach below the main doc above Appendices A - I
- Appendix A: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix B: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix C: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix D: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix E: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix G: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix H: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- Appendix I: Phase I Environmental Site Assessment Fargo Metro Feasibility Study HTRW
- The U.S. Army Corps of Engineers’ Guidance for Compensatory Mitigation and Mitigation Banking in the Omaha District. August 2005
- This is a link to a USACE webpage, assuming it is up to date, but dated originally August 1, 2005