excavated materials consisting of topsoil or subsoils that have been removed and temporarily stored during the construction activity. (https://www.michigan.gov/documents/deq/deq- wb-nps-sp_250905_7.pdf)

Similar Posts:

    Share this Post or Follow the FM Area Diversion Project
    error