Comprised of the diversion channel, connecting channel, excavated material berms, shallow drainage ditches outside of the berms, tieback embankment, overflow embankment, control structures in the Red and Wild Rice Rivers, and aqueducts structures in the Maple and Sheyenne Rivers.

Similar Posts:

    Share this Post or Follow the FM Area Diversion Project
    error