Portions of the Project that would result in a direct impact from disturbance during Project construction, such as excavation, piling of earthen material, and equipment movement. In general these areas include the diversion channel, connecting channel, excavated material berms, and embankments

Similar Posts:

    Share this Post or Follow the FM Area Diversion Project
    error