USACE December 2020 Update
USACE October 2020 Monthly Update 1 Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. Placement of right dam walls and H-pile driving in stilling basin continues. Construction…
USACE October 2020 Monthly Update 1 Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. Placement of right dam walls and H-pile driving in stilling basin continues. Construction…
USACE October 2020 Monthly Update November 19, 2020 1 Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. The concrete approach and structure slabs downstream stepped slabs are…
Interstate 29 Road Raise Project Ready for Construction 4.2 miles of road to be raised; Four-lane Bypass to be Built for Traffic Flow During Construction The U.S. Army Corps of…
USACE October 2020 Monthly Update October 22, 2020 1 Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. The concrete approach and structure slabs are complete; placement of…
USACE July 2020 Monthly Update July 23, 2020 1 Diversion Inlet Structure Construction Structure includes 3-50 ft. wide Tainter gates. The current construction completion date is 7 June 2023. Anticipated…
The following is a press release from the U.S. Army Corps of Engineers St. Paul District For Immediate Release July 1, 2020 News Release No. MVP-PA-2020-055 Contacts:Patrick Moes: 651.290.5202, 651.366.7539 …
The Diversion Authority today received confirmation the United States Environmental Protection Agency (EPA) has invited the Diversion Authority to apply for a low-interest Water Infrastructure Finance and Innovation (WIFIA) loan.…
The FM Area Diversion Project requires different types of property rights to build and operate the Project. The Project requires the acquisition of over 9,000 acres for the construction footprint…