Minnesota DNR Documents

  • Post category:Library / Study

On December 27, 2018, the DNR granted a Dam Safety and Public Waters Work permit for a revised Fargo-Moorhead Flood Risk Management Project, known as Plan B. The DNR’s decision…

U.S. Army Corps of Engineers Studies

  • Post category:Library / Study

Supplemental Environmental Assessment Appendix A – Final Report Appendix B – Technical Advisory Group Summary Appendix C – Alternative C Analysis Appendix D – Hydrology and Hydraulics Appendix E – Northwest…

Additional Studies

  • Post category:Library / Study

Corps of Engineers/FEMA Documents Fargo-Moorhead Final FEMA/USACE Coordination Plan Doc Date:  April 14, 2015 Editor’s Notes:  Coordination plan outlines the Floodplain Management Requirements, FEMA Flood Insurance Study, Modeling and other…

DNR Supplemental EIS

  • Post category:Library / Study

From the Minnesota DNR website Fargo-Moorhead Flood Risk Management Project - Supplemental Environmental Impact Statement The DNR issued the Final Supplemental Environmental Impact Statement (Final SEIS) for the Fargo-Moorhead Flood…

End of content

No more pages to load